Home Projects & Initiatives Projects Wright Road Bridge Replacement

Wright Road Bridge Replacement

Print

The current Wright Road Bridge structure is a one lane bridge due to deterioration. The bridge needs replaced and SCE has secured funds from the CEAO Local Bridge Program to replace the bridge. The original funding year for the project wasn’t until 2022, however SCE was able to move up the availability of that funding so that it can be constructed in 2019/2020.

Total project cost estimate: $922,000            

CEAO Bridge Program will provide 80% funding not to exceed 897,600.00