Proposed : Akron-Peninsula Rd. Bridge Replacement

LAST UPDATED:

Feb 22, 2024

Project Details

Communities:

Boston Township

Project Schedule

Plan Year:

01-01-2025 - 12-31-2026

This project will be a complete replacement of the existing 28 ft long by 34 ft wide Akron Peninsula Rd. Bridge over Salt Run. It is located just south of Truxell Road in Boston Townhip. 

Status:

At this time there are no status updates.
Bridge construction is scheduled for 2026.

Graphical map of project site

Maintenance of Traffic:

To be determined in the design phase.

Image of Akron Peninsula Bridge Over Salt Run POV 02/22/2024

Costs

Total:

$1,480,000

Funding Sources:

To be determined.