Construction : Cleveland Massillon Rd. - Sidewalk Project
LAST UPDATED:
Apr 15, 2025
Communities:
Bath Township
Design Consultant:
EDG
Plan Year:
04-21-2025 - 05-05-2025
Construction Starts:
Apr 15, 2025
The contractor (Geauga Highway) is planning on starting work on this project on April 21st, installing new sidewalk, drive aprons and miscellaneous work. The work requires the closing of the curb lane on SR 18 form approx. 450’ east of Cleve Mass Rd. intersection to 200’ west of the intersection. At the conclusion of the daily work the zone will be removed. There will also be a lane closure on Cleveland Massillon Rd. at the same time. This closure is the southbound right lane from Springside Drive to SR 18. The total length of new sidewalk will be approx. 2365 feet. Both closures will be from April 21st to the middle of May 5th (weather permitting). Drive entrances inside the closures will be maintained but may have reduced widths.
Status:
Geauga Highway Construction is the contractor that was awarded this project.
- 04/01/2025: Contract was sent to contractors for award and preconstruction meeting was scheduled for next week.
Location:
The project limits go from SR 18 to Springside Dr.
Maintenance of Traffic:
Work will include temporary lane closures to accommodate construction activities. Driveway access will be maintained throughout the project, though some entrances may experience reduced widths during construction.