Design : SWMD: Copley Ditch and Black Pond Outlet Improvements
LAST UPDATED:
Sep 13, 2024
Project Details
Communities:
Copley Township
Design Consultant:
Enviroscience, Inc
Project Schedule
Plan Year:
06-01-2023 - 10-01-2024
The project will hydraulicly connect the Copley Ditch and Black Pond outlet to the adjacent flood plains and wetlands to provide storage for storm water runoff and improved water quality.
Status:
The study and design of this project is underway.
Location:
In Copley Township benefitting Pigeon Creek, Copley Ditch, and the Tuscarawas Watershed.
- Copley Ditch/Black Pond Outlet Preliminary Design Report (PDF, 16412.2k)