Proposed : SWMD - Bonnebrook Drive Pond Outlet Control
LAST UPDATED:
Jul 3, 2023
Project Details
Communities:
Bath Township
Project Schedule
Plan Year:
06-01-2024 - 12-30-2024
The proposed project is to install a Smart Outlet Control to lower water level prior to storms and release the stormwater slowly to return to normal pond levels.
Status:
This project is in the early proposal stages.
Location:
In Bath Township, benefitting the Revere Run tributary flowing to Yellow Creek and then the Cuyahoga River